10 KiB
Version 1 Implementation Plan
This plan defines the path from MVP to Version 1 complete.
The objective is to deliver the full scoped product with readiness for reliable personal-scale operation, while explicitly separating refinements/enhancements into a future document.
0) Plan Governance & Scope Control (Foundation)
Goal: Keep execution focused on V1 completion and avoid unnecessary process overhead.
Implementation Steps
- Create and maintain a V1 Traceability Matrix:
- Requirement ID
- Current status (
done,partial,not started) - Validation method
- Define V1 completion gates:
- Functional complete
- Operationally complete
- Personal-deployment ready
- Snapshot the MVP baseline (tag/changelog reference).
- Keep a standing rule: non-V1 ideas go to a separate enhancements backlog, and enter V1 only by explicit approval.
Deliverables
docs/ver1/ver1.md(this plan)- V1 traceability artifact:
docs/ver1/ver1-step1-2-carry-forward-checklist.mddocs/ver1/ver1-step2-error-path-inventory.md(supporting artifact)
Exit Criteria
- Every in-scope requirement has explicit status and validation evidence.
- Scope-change discipline is followed consistently.
1) Architecture Consolidation
Goal: Align implementation with intended architecture while preserving simplicity.
Implementation Steps
- Compare implemented modules/components with architecture documentation.
- Identify and classify architectural debt:
- Temporary coupling
- Missing interfaces
- Placeholder services/components
- Resolve architecture gaps that threaten reliability, maintainability, or clear boundaries.
- Record material decisions and tradeoffs in ADRs.
Deliverables
- Updated architecture diagrams and boundaries
- ADR entries for material decisions
Exit Criteria
- Architecture documentation reflects system reality.
- High-impact architecture risks are addressed or explicitly scheduled.
2) Error Handling & Reliability Hardening
Goal: Ensure predictable, diagnosable behavior under expected failure conditions.
Implementation Steps
- Apply the canonical taxonomy and response model from
docs/error_handling.mdacross UI/API/service/worker boundaries. - Ensure clear distinction between:
- User-facing safe messages
- Internal diagnostic detail
- Retryable vs non-retryable failures
- Implement practical resilience controls where needed:
- Timeouts
- Bounded retries with backoff
- Explicit terminal failure states
- Add failure-path tests for critical workflows.
Deliverables
- Error handling reference aligned with
docs/error_handling.md - Failure-mode test coverage for critical paths
Exit Criteria
- Error behavior is consistent across major flows.
- Known failure scenarios are tested and pass.
- Failed jobs include actionable, traceable failure detail.
3) Functional Completion by Requirement Domain
Goal: Complete all V1 requirements in a practical, user-first order.
Recommended Order
- End-user core flows (upload → transcribe → review)
- Data integrity and persistence behavior
- Minimal operator controls needed for personal use
- In-scope UX quality improvements
Implementation Steps
For each requirement slice:
- Confirm contract/schema
- Implement service/domain logic
- Implement persistence/state transitions
- Integrate API/UI behavior
- Add or update automated tests
- Update relevant docs
Deliverables
- Requirement completion report with validation evidence linked to REQ IDs
Exit Criteria
- All V1 must-have requirements are complete and verified.
4) Data Model and Migration Safety
Goal: Keep schema evolution safe and simple for personal-scale deployment.
Implementation Steps
- Validate schema against finalized V1 domain needs.
- Implement forward-safe migrations for expected upgrades.
- Define a simple rollback/mitigation path for migration failures.
- Add backfill scripts only where truly required.
- Rehearse migration + rollback locally using representative sample data.
Deliverables
- Migration and rollback runbook
- Backfill checklist (if applicable)
Exit Criteria
- Migration path is tested and documented.
- No unresolved data-loss risk for V1 upgrade.
5) Private-Network Safety Baseline
Goal: Apply right-sized security controls for a single-user system on a trusted private network.
Implementation Steps
- Enforce private-network deployment assumptions in docs and configuration.
- Ensure basic single-operator access control for UI/API actions.
- Enforce input validation and safe error output behavior.
- Keep secrets out of source control; document local secret handling.
- Run lightweight dependency/security scanning and resolve high-risk findings.
Deliverables
- Security assumptions checklist (private network, single operator)
- Basic risk update for V1 scope
Exit Criteria
- No unresolved critical vulnerabilities.
- Access behavior and validation rules are verified for intended operating model.
6) Minimal Observability & Operability
Goal: Keep operation and troubleshooting simple, clear, and reliable.
Implementation Steps
- Standardize structured logging across UI/API/service/worker boundaries.
- Ensure logged errors include category and error reference IDs per
error_handling.md. - Add lightweight health/startup checks.
- Document a concise operator runbook:
- start/stop
- log locations
- common failure patterns and recovery steps
- Add minimal counters/timings only where they clearly improve diagnosis.
Deliverables
- Logging and error-traceability baseline
- Operator runbook
Exit Criteria
- Operator can diagnose common failures using logs + runbook.
- System recovery procedures are documented and repeatable.
7) Test Coverage and Practical Quality Gates
Goal: Prevent regressions in critical flows without overbuilding test infrastructure.
Implementation Steps
- Expand unit and integration tests for all V1 requirement slices.
- Add end-to-end tests for critical journeys:
- upload
- process/transcribe
- view result
- failure visibility
- Add targeted contract tests where adapter boundaries are error-prone.
- Keep CI gates focused on high-value checks (tests, lint, type checks, dependency scan).
Deliverables
- V1 test matrix mapped to requirements and critical flows
- CI quality-gate checklist
Exit Criteria
- Critical-path regressions are automatically detected.
- Test suite gives consistent release confidence for personal-scale operation.
8) Performance Validation for Personal Scale
Goal: Confirm acceptable responsiveness for expected personal-use workload.
Implementation Steps
- Define practical performance expectations for key flows.
- Run representative tests using real document samples.
- Address obvious bottlenecks in queries, file handling, or worker concurrency.
- Document known limits and expected operating bounds.
Deliverables
- Short performance validation note
- Known-limits summary
Exit Criteria
- Core flows remain responsive for expected corpus size and usage patterns.
9) Release Readiness and Environment Simplicity
Goal: Make deployment and rollback repeatable for a single-operator Docker Compose setup.
Implementation Steps
- Define a simple release checklist:
- run tests
- run one end-to-end transcription check
- verify migration compatibility
- Document environment configuration requirements clearly.
- Validate deployment and rollback steps in a local rehearsal.
- Add backup/restore verification for core persisted data.
Deliverables
- Release checklist
- Environment and rollback guide
Exit Criteria
- Deployment/rollback is rehearsed and documented.
- Operator can release safely without hidden steps.
10) Documentation Completion
Goal: Ensure V1 can be built, operated, and supported from documentation.
Implementation Steps
- Update core project docs to match final V1 behavior:
- Architecture
- Error handling
- Requirements status
- Index/navigation
- Intent alignment summary
- Add operator troubleshooting guides.
- Add integration/API examples for the operator and future maintainers.
- Publish changelog/version notes for V1.
Deliverables
- Updated documentation set for V1
- V1 release notes
Exit Criteria
- A future maintainer can run and support the system using docs alone.
11) Final Validation and Launch
Goal: Confirm V1 readiness and launch with low operational risk.
Implementation Steps
- Run end-to-end acceptance validation against the V1 traceability matrix.
- Complete operator acceptance checks on representative real documents.
- Execute launch checklist (including backup, migration, and rollback readiness).
- Launch and monitor logs/status closely during initial use.
Deliverables
- Acceptance validation record
- Launch checklist completion record
Exit Criteria
- V1 requirements are validated.
- Initial launch behavior is stable and recoverable.
12) Post-Launch Stabilization
Goal: Address early issues quickly and lock in a reliable V1 baseline.
Implementation Steps
- Track defects and operational pain points observed after launch.
- Prioritize short-cycle stabilization fixes.
- Remove temporary launch-only workarounds when safe.
- Capture a brief retrospective and update the next-phase backlog.
Deliverables
- Stabilization summary
- Updated backlog for post-V1 enhancements
Exit Criteria
- Major launch issues are resolved.
- System transitions to steady personal-use operation.
Recommended Execution Rhythm
- Weekly: Requirement closure + risk review
- As needed (small batch releases): Run release checklist and deploy
- Milestone check-ins: After phases 2, 6, 9, and 11
Scope Discipline Rule (V1 Focus)
To preserve delivery focus:
- V1 execution prioritizes completion of scoped requirements.
- Refinements/enhancements are captured in a separate future document and backlog.
- Only explicitly approved scope changes may enter this plan.