Files
transcription/docs/ver1/ver1-step1-2_revised.md
T
2026-06-26 14:21:24 -05:00

6.3 KiB

Ver1 Step 1 & Step 2 Revision Plan (Additive)

Purpose

Define a targeted implementation follow-through plan for Step 1 and Step 2 outcomes so remaining V1 work stays aligned with docs/ver1/ver1.md:

  • personal-scale operation
  • single operator
  • private-network assumptions
  • low operational overhead
  • practical, testable controls

This document is additive and does not replace or revise historical Step 1/Step 2 records.


Source Documents Reviewed

  • docs/ver1/ver1.md
  • docs/ver1/ver1-step1.md
  • docs/ver1/ver1-step1-results.md
  • docs/ver1/ver1-step2.md
  • docs/ver1/ver1-step2-results.md
  • docs/architecture.md
  • docs/error_handling.md
  • docs/requirements.md
  • docs/index.md
  • docs/intent.md

Revision Goals

  1. Preserve all completed Step 1/Step 2 technical hardening work.
  2. Keep historical Step 1/Step 2 documents unchanged.
  3. Convert residual risks/follow-ups into concrete implementation tasks for subsequent V1 steps.
  4. Preserve traceability to requirements and implemented evidence.
  5. Maintain alignment with personal-scale architecture and operating model.

Scope

In Scope

  • Define carry-forward implementation tasks based on Step 1/2 residual risks and open items.
  • Map carry-forward tasks to later V1 steps (especially Steps 3, 4, 6, 7, and 9).
  • Define lightweight verification evidence expected for each carry-forward task.
  • Update V1 traceability references to include completed Step 1/2 outcomes and deferred follow-ups.

Out of Scope

  • Simplifying tone/structure of existing Step 1/2 documents
  • Clarifying or rewriting historical Step 1/2 plan/results content
  • Editing docs/ver1/ver1-step1.md
  • Editing docs/ver1/ver1-step1-results.md
  • Editing docs/ver1/ver1-step2.md
  • Editing docs/ver1/ver1-step2-results.md
  • Re-implementing Step 1/2 code changes
  • Rewriting docs/ver1/ver1.md
  • Deleting historical sections/results
  • Altering requirements IDs or architecture principles

Carry-Forward Implementation Plan

Workstream A — Close Step 1 follow-ups through later V1 steps

A1) Runtime ownership completion (REQ-7 continuity)

  • Confirm whether any remaining runtime resources still use implicit/global ownership.
  • Move only high-impact remaining resources to explicit lifespan ownership when needed.
  • Keep ownership model simple and documented.

A2) Schema/migration operations readiness (REQ-10 continuity)

  • Finalize practical migration + rollback runbook usage in Step 4 execution.
  • Rehearse upgrade and rollback on representative local data.
  • Keep production startup free from implicit schema mutation.

A3) Boundary enforcement (lightweight only)

  • Keep architecture boundary checks lightweight (review checklist and/or simple import checks).
  • Avoid heavy governance tooling unless clear recurring drift appears.

Expected Outcome

Step 1 architecture hardening remains intact and is completed pragmatically where open items remain.


Workstream B — Close Step 2 follow-ups through later V1 steps

B1) Error-path inventory and coverage visibility

  • Create a compact error-path inventory artifact (or equivalent matrix section) covering major failure paths.
  • Ensure each critical path maps to category, retriable policy, and surfaced behavior.

B2) Logging field consistency at key boundaries

  • Standardize required fields at critical failure handoffs (error_id, category, operation, identifiers when available).
  • Prioritize worker/API/service boundaries first.

B3) Retry policy refinement (only if needed)

  • Keep current bounded retry baseline.
  • Revisit richer backoff strategy only if observed behavior justifies added complexity.

Expected Outcome

Step 2 reliability behavior stays stable, diagnosable, and right-sized for personal-scale operation.


Workstream C — Integrate Step 1/2 outputs into ongoing V1 governance

C1) Traceability integration

  • Link completed Step 1/2 outcomes and deferred follow-ups to the V1 traceability matrix.
  • Ensure open follow-ups have owning step and validation method.

C2) Execution alignment with revised V1 plan

  • Route architecture follow-ups primarily through Steps 3/4/9.
  • Route reliability/diagnostics follow-ups primarily through Steps 6/7.

Expected Outcome

Step 1/2 work is fully carried forward without revising historical documents.

Deliverables

  1. This document (docs/ver1/ver1-step1-2_revised.md) as the carry-forward implementation plan.
  2. A compact Step 1/2 carry-forward checklist linked to V1 steps and validation methods.
  3. Traceability updates showing where each open Step 1/2 follow-up will be closed.
  4. Optional new artifact for error-path inventory (if created during Step 6/7 execution).

Acceptance Criteria

  • Historical Step 1/Step 2 documents remain unchanged.
  • Open Step 1/2 follow-ups are explicitly mapped to later V1 steps with validation expectations.
  • No loss of core technical intent (REQ-7, REQ-10, error taxonomy, retry safety, traceability).
  • No conflicts introduced with docs/architecture.md, docs/error_handling.md, or docs/ver1/ver1.md.
  • Carry-forward tasks remain right-sized for personal-scale operation.

Implementation Order

  1. Keep existing Step 1/Step 2 docs unchanged as historical records.
  2. Define carry-forward tasks and owning V1 steps in this document.
  3. Create and maintain carry-forward traceability artifacts:
    • docs/ver1/ver1-step1-2-carry-forward-checklist.md
    • docs/ver1/ver1-step2-error-path-inventory.md
  4. Execute carry-forward tasks during Steps 3+ and capture evidence in step results docs.
  5. Perform final consistency pass across docs/ver1/* references.

Risks and Mitigations

  1. Risk: Open Step 1/2 items are forgotten as Step 3+ work proceeds.
    Mitigation: Track each follow-up in the V1 traceability matrix with owning step and evidence expectation.

  2. Risk: Carry-forward work expands beyond personal-scale needs.
    Mitigation: Apply simplicity guardrails from docs/architecture.md before accepting additional hardening tasks.

  3. Risk: Reliability follow-ups become fragmented across multiple steps.
    Mitigation: Keep one consolidated carry-forward checklist and update it at milestone check-ins.


Notes

This revision effort is scope-alignment and implementation-follow-through focused.
Historical Step 1/Step 2 documents are intentionally preserved as-is.