6.3 KiB
Ver1 Step 1 & Step 2 Revision Plan (Additive)
Purpose
Define a targeted implementation follow-through plan for Step 1 and Step 2 outcomes so remaining V1 work stays aligned with docs/ver1/ver1.md:
- personal-scale operation
- single operator
- private-network assumptions
- low operational overhead
- practical, testable controls
This document is additive and does not replace or revise historical Step 1/Step 2 records.
Source Documents Reviewed
docs/ver1/ver1.mddocs/ver1/ver1-step1.mddocs/ver1/ver1-step1-results.mddocs/ver1/ver1-step2.mddocs/ver1/ver1-step2-results.mddocs/architecture.mddocs/error_handling.mddocs/requirements.mddocs/index.mddocs/intent.md
Revision Goals
- Preserve all completed Step 1/Step 2 technical hardening work.
- Keep historical Step 1/Step 2 documents unchanged.
- Convert residual risks/follow-ups into concrete implementation tasks for subsequent V1 steps.
- Preserve traceability to requirements and implemented evidence.
- Maintain alignment with personal-scale architecture and operating model.
Scope
In Scope
- Define carry-forward implementation tasks based on Step 1/2 residual risks and open items.
- Map carry-forward tasks to later V1 steps (especially Steps 3, 4, 6, 7, and 9).
- Define lightweight verification evidence expected for each carry-forward task.
- Update V1 traceability references to include completed Step 1/2 outcomes and deferred follow-ups.
Out of Scope
- Simplifying tone/structure of existing Step 1/2 documents
- Clarifying or rewriting historical Step 1/2 plan/results content
- Editing
docs/ver1/ver1-step1.md - Editing
docs/ver1/ver1-step1-results.md - Editing
docs/ver1/ver1-step2.md - Editing
docs/ver1/ver1-step2-results.md - Re-implementing Step 1/2 code changes
- Rewriting
docs/ver1/ver1.md - Deleting historical sections/results
- Altering requirements IDs or architecture principles
Carry-Forward Implementation Plan
Workstream A — Close Step 1 follow-ups through later V1 steps
A1) Runtime ownership completion (REQ-7 continuity)
- Confirm whether any remaining runtime resources still use implicit/global ownership.
- Move only high-impact remaining resources to explicit lifespan ownership when needed.
- Keep ownership model simple and documented.
A2) Schema/migration operations readiness (REQ-10 continuity)
- Finalize practical migration + rollback runbook usage in Step 4 execution.
- Rehearse upgrade and rollback on representative local data.
- Keep production startup free from implicit schema mutation.
A3) Boundary enforcement (lightweight only)
- Keep architecture boundary checks lightweight (review checklist and/or simple import checks).
- Avoid heavy governance tooling unless clear recurring drift appears.
Expected Outcome
Step 1 architecture hardening remains intact and is completed pragmatically where open items remain.
Workstream B — Close Step 2 follow-ups through later V1 steps
B1) Error-path inventory and coverage visibility
- Create a compact error-path inventory artifact (or equivalent matrix section) covering major failure paths.
- Ensure each critical path maps to category, retriable policy, and surfaced behavior.
B2) Logging field consistency at key boundaries
- Standardize required fields at critical failure handoffs (
error_id,category,operation, identifiers when available). - Prioritize worker/API/service boundaries first.
B3) Retry policy refinement (only if needed)
- Keep current bounded retry baseline.
- Revisit richer backoff strategy only if observed behavior justifies added complexity.
Expected Outcome
Step 2 reliability behavior stays stable, diagnosable, and right-sized for personal-scale operation.
Workstream C — Integrate Step 1/2 outputs into ongoing V1 governance
C1) Traceability integration
- Link completed Step 1/2 outcomes and deferred follow-ups to the V1 traceability matrix.
- Ensure open follow-ups have owning step and validation method.
C2) Execution alignment with revised V1 plan
- Route architecture follow-ups primarily through Steps 3/4/9.
- Route reliability/diagnostics follow-ups primarily through Steps 6/7.
Expected Outcome
Step 1/2 work is fully carried forward without revising historical documents.
Deliverables
- This document (
docs/ver1/ver1-step1-2_revised.md) as the carry-forward implementation plan. - A compact Step 1/2 carry-forward checklist linked to V1 steps and validation methods.
- Traceability updates showing where each open Step 1/2 follow-up will be closed.
- Optional new artifact for error-path inventory (if created during Step 6/7 execution).
Acceptance Criteria
- Historical Step 1/Step 2 documents remain unchanged.
- Open Step 1/2 follow-ups are explicitly mapped to later V1 steps with validation expectations.
- No loss of core technical intent (REQ-7, REQ-10, error taxonomy, retry safety, traceability).
- No conflicts introduced with
docs/architecture.md,docs/error_handling.md, ordocs/ver1/ver1.md. - Carry-forward tasks remain right-sized for personal-scale operation.
Implementation Order
- Keep existing Step 1/Step 2 docs unchanged as historical records.
- Define carry-forward tasks and owning V1 steps in this document.
- Create and maintain carry-forward traceability artifacts:
docs/ver1/ver1-step1-2-carry-forward-checklist.mddocs/ver1/ver1-step2-error-path-inventory.md
- Execute carry-forward tasks during Steps 3+ and capture evidence in step results docs.
- Perform final consistency pass across
docs/ver1/*references.
Risks and Mitigations
-
Risk: Open Step 1/2 items are forgotten as Step 3+ work proceeds.
Mitigation: Track each follow-up in the V1 traceability matrix with owning step and evidence expectation. -
Risk: Carry-forward work expands beyond personal-scale needs.
Mitigation: Apply simplicity guardrails fromdocs/architecture.mdbefore accepting additional hardening tasks. -
Risk: Reliability follow-ups become fragmented across multiple steps.
Mitigation: Keep one consolidated carry-forward checklist and update it at milestone check-ins.
Notes
This revision effort is scope-alignment and implementation-follow-through focused.
Historical Step 1/Step 2 documents are intentionally preserved as-is.