Files
transcription/docs/ver1/ver1-step1-2-carry-forward-checklist.md
T
2026-06-26 14:21:24 -05:00

3.7 KiB

Ver1 Step 1/2 Carry-Forward Checklist

Purpose

Track open Step 1 and Step 2 follow-ups through later V1 steps, with lightweight verification evidence and requirement traceability.

This artifact implements the carry-forward approach defined in:

  • docs/ver1/ver1-step1-2_revised.md

Historical records remain unchanged:

  • docs/ver1/ver1-step1.md
  • docs/ver1/ver1-step1-results.md
  • docs/ver1/ver1-step2.md
  • docs/ver1/ver1-step2-results.md

Status Legend

  • not started
  • in progress
  • done
  • deferred

Carry-Forward Mapping Matrix

ID Carry-Forward Task Source Related REQ Owning V1 Step(s) Validation Method Status Evidence Link/Note
CF-A1 Confirm remaining implicit/global runtime ownership and lift only high-impact resources to lifespan ownership Step 1 residual follow-up REQ-7 Step 3, Step 9 Inspection + test not started
CF-A2 Finalize migration + rollback runbook usage and rehearse on representative local data Step 1 residual follow-up REQ-10 Step 4, Step 9 Demonstration + test not started
CF-A3 Maintain lightweight boundary enforcement (review checklist and/or simple import checks) Step 1 residual follow-up REQ-7, REQ-11 Step 3, Step 7 Inspection not started
CF-B1 Build compact error-path inventory for major failure paths and category mapping Step 2 governance follow-up REQ-2, REQ-3, REQ-4, REQ-5 Step 6, Step 7 Inspection not started Use docs/ver1/ver1-step2-error-path-inventory.md
CF-B2 Standardize required logging fields at critical boundary handoffs Step 2 residual follow-up REQ-3, REQ-4, REQ-8 Step 6 Inspection + test not started
CF-B3 Revisit retry backoff strategy only if observed runtime behavior justifies extra complexity Step 2 residual follow-up REQ-2, REQ-6 Step 6, Step 8 Analysis + test deferred Keep fixed backoff unless evidence suggests change
CF-C1 Integrate Step 1/2 completed outcomes and open follow-ups into V1 traceability tracking Revision-plan workstream REQ-0..REQ-12 (traceability) Step 3, Step 10 Inspection in progress This checklist is the initial integration artifact
CF-C2 Keep carry-forward routing aligned with revised V1 plan (architecture via 3/4/9, reliability via 6/7) Revision-plan workstream REQ-0..REQ-12 (execution alignment) Step 3+ Inspection in progress Routing established in this matrix

Execution Notes

Step 3 (Functional Completion)

  • Use CF-A1 and CF-A3 during requirement-slice implementation reviews.
  • Record any discovered boundary/runtime ownership gaps in this checklist.

Step 4 (Data Model and Migration Safety)

  • Execute CF-A2 rehearsal and link evidence (commands, runbook notes, outcomes).

Step 6 (Minimal Observability & Operability)

  • Execute CF-B1 and CF-B2 with focused artifacts and log-field verification.

Step 7 (Test Coverage and Practical Quality Gates)

  • Add/verify tests supporting CF-A3 and CF-B1/B2 where meaningful.

Step 8 (Performance Validation)

  • Reassess CF-B3 only if retries/backoff are observed to cause practical issues.

Step 9 (Release Readiness)

  • Reconfirm CF-A1/A2 readiness in release checklist and rollback drill.

Step 10 (Documentation Completion)

  • Ensure final V1 docs reference outcomes from this checklist where relevant.

Acceptance Check for Carry-Forward Completion

  • Historical Step 1/2 documents remain unchanged.
  • Every open Step 1/2 follow-up has an owning V1 step and validation method.
  • Evidence links are recorded for each completed carry-forward item.
  • No carry-forward item introduces unnecessary complexity for personal-scale operation.