generated from john/python-template
Ver1.md updated to refocus on personal, smaller-scale deployment
This commit is contained in:
+130
-130
@@ -1,40 +1,39 @@
|
||||
# Version 1 Implementation Plan
|
||||
|
||||
This plan defines the path from MVP to **Version 1 complete**.
|
||||
The objective is to deliver the full scoped product with production readiness, while explicitly separating refinements/enhancements into a future document.
|
||||
The objective is to deliver the full scoped product with readiness for reliable personal-scale operation, while explicitly separating refinements/enhancements into a future document.
|
||||
|
||||
---
|
||||
|
||||
## 0) Plan Governance & Scope Control (Foundation)
|
||||
|
||||
**Goal:** Keep execution focused on V1 completion, not optimization/perfection.
|
||||
**Goal:** Keep execution focused on V1 completion and avoid unnecessary process overhead.
|
||||
|
||||
### Implementation Steps
|
||||
1. Create and maintain a **V1 Traceability Matrix**:
|
||||
- Requirement ID
|
||||
- Current status (`done`, `partial`, `not started`)
|
||||
- Owner
|
||||
- Validation method
|
||||
2. Define V1 completion gates:
|
||||
- Functional complete
|
||||
- Operationally complete
|
||||
- Production-ready complete
|
||||
- Personal-deployment ready
|
||||
3. Snapshot the MVP baseline (tag/changelog reference).
|
||||
4. Create a standing rule: any non-V1 idea is logged to a separate enhancements backlog document (to be named later), not added to active V1 scope unless explicitly approved.
|
||||
4. Keep a standing rule: non-V1 ideas go to a separate enhancements backlog, and enter V1 only by explicit approval.
|
||||
|
||||
### Deliverables
|
||||
- `docs/ver1/ver1.md` (this plan)
|
||||
- V1 traceability artifact (linked from here when created)
|
||||
|
||||
### Exit Criteria
|
||||
- Every in-scope requirement has explicit ownership and status.
|
||||
- Scope-change process is agreed and followed.
|
||||
- Every in-scope requirement has explicit status and validation evidence.
|
||||
- Scope-change discipline is followed consistently.
|
||||
|
||||
---
|
||||
|
||||
## 1) Architecture Consolidation
|
||||
|
||||
**Goal:** Align implementation with the intended architecture and reduce MVP shortcuts.
|
||||
**Goal:** Align implementation with intended architecture while preserving simplicity.
|
||||
|
||||
### Implementation Steps
|
||||
1. Compare implemented modules/components with architecture documentation.
|
||||
@@ -42,201 +41,202 @@ The objective is to deliver the full scoped product with production readiness, w
|
||||
- Temporary coupling
|
||||
- Missing interfaces
|
||||
- Placeholder services/components
|
||||
3. Resolve high-risk architectural gaps first.
|
||||
4. Record key decisions and tradeoffs in ADRs.
|
||||
3. Resolve architecture gaps that threaten reliability, maintainability, or clear boundaries.
|
||||
4. Record material decisions and tradeoffs in ADRs.
|
||||
|
||||
### Deliverables
|
||||
- Updated architecture diagrams and boundaries
|
||||
- ADR entries for major decisions
|
||||
- ADR entries for material decisions
|
||||
|
||||
### Exit Criteria
|
||||
- Architecture documentation reflects system reality.
|
||||
- Critical architecture risks are addressed or scheduled with owners/dates.
|
||||
- High-impact architecture risks are addressed or explicitly scheduled.
|
||||
|
||||
---
|
||||
|
||||
## 2) Error Handling & Reliability Hardening
|
||||
|
||||
**Goal:** Ensure predictable, safe behavior under failure conditions.
|
||||
**Goal:** Ensure predictable, diagnosable behavior under expected failure conditions.
|
||||
|
||||
### Implementation Steps
|
||||
1. Standardize error taxonomy and envelope format across all layers.
|
||||
1. Apply the canonical taxonomy and response model from `docs/error_handling.md` across UI/API/service/worker boundaries.
|
||||
2. Ensure clear distinction between:
|
||||
- User-facing errors
|
||||
- Internal/system errors
|
||||
- User-facing safe messages
|
||||
- Internal diagnostic detail
|
||||
- Retryable vs non-retryable failures
|
||||
3. Add resilience controls where needed:
|
||||
3. Implement practical resilience controls where needed:
|
||||
- Timeouts
|
||||
- Retries with backoff
|
||||
- Circuit breaking / fallback logic
|
||||
- Bounded retries with backoff
|
||||
- Explicit terminal failure states
|
||||
4. Add failure-path tests for critical workflows.
|
||||
|
||||
### Deliverables
|
||||
- Error code catalog/reference
|
||||
- Failure mode test coverage for critical paths
|
||||
- Error handling reference aligned with `docs/error_handling.md`
|
||||
- Failure-mode test coverage for critical paths
|
||||
|
||||
### Exit Criteria
|
||||
- Error behavior is consistent across major flows.
|
||||
- Known failure scenarios are tested and pass.
|
||||
- Failed jobs include actionable, traceable failure detail.
|
||||
|
||||
---
|
||||
|
||||
## 3) Functional Completion by Requirement Domain
|
||||
|
||||
**Goal:** Complete all V1 functional requirements in a risk-aware order.
|
||||
**Goal:** Complete all V1 requirements in a practical, user-first order.
|
||||
|
||||
### Recommended Order
|
||||
1. Business-critical end-user flows
|
||||
2. Data integrity and consistency capabilities
|
||||
3. Admin/operational controls
|
||||
4. Lower-priority UX and quality-of-life items that are in V1 scope
|
||||
1. End-user core flows (upload → transcribe → review)
|
||||
2. Data integrity and persistence behavior
|
||||
3. Minimal operator controls needed for personal use
|
||||
4. In-scope UX quality improvements
|
||||
|
||||
### Implementation Steps
|
||||
For each requirement slice:
|
||||
1. Finalize contract/schema
|
||||
2. Implement domain logic
|
||||
3. Implement persistence/state changes
|
||||
4. Integrate API/UI
|
||||
5. Add automated tests
|
||||
6. Update docs
|
||||
1. Confirm contract/schema
|
||||
2. Implement service/domain logic
|
||||
3. Implement persistence/state transitions
|
||||
4. Integrate API/UI behavior
|
||||
5. Add or update automated tests
|
||||
6. Update relevant docs
|
||||
|
||||
### Deliverables
|
||||
- Requirement completion report with validation evidence
|
||||
- Requirement completion report with validation evidence linked to REQ IDs
|
||||
|
||||
### Exit Criteria
|
||||
- All V1 “must-have” requirements are complete and validated.
|
||||
- All V1 must-have requirements are complete and verified.
|
||||
|
||||
---
|
||||
|
||||
## 4) Data Model, Migration, and Backfill Safety
|
||||
## 4) Data Model and Migration Safety
|
||||
|
||||
**Goal:** Ensure data model and migrations are production-safe.
|
||||
**Goal:** Keep schema evolution safe and simple for personal-scale deployment.
|
||||
|
||||
### Implementation Steps
|
||||
1. Validate schema against final V1 domain needs.
|
||||
2. Implement forward-safe migrations.
|
||||
3. Define rollback/mitigation plans for migration failures.
|
||||
4. Build and verify backfill scripts (if needed).
|
||||
5. Add migration rehearsal in staging with representative data.
|
||||
1. Validate schema against finalized V1 domain needs.
|
||||
2. Implement forward-safe migrations for expected upgrades.
|
||||
3. Define a simple rollback/mitigation path for migration failures.
|
||||
4. Add backfill scripts only where truly required.
|
||||
5. Rehearse migration + rollback locally using representative sample data.
|
||||
|
||||
### Deliverables
|
||||
- Migration runbook
|
||||
- Backfill verification checklist
|
||||
- Migration and rollback runbook
|
||||
- Backfill checklist (if applicable)
|
||||
|
||||
### Exit Criteria
|
||||
- Migration plan validated in staging.
|
||||
- No unresolved data-loss risk for V1 rollout.
|
||||
- Migration path is tested and documented.
|
||||
- No unresolved data-loss risk for V1 upgrade.
|
||||
|
||||
---
|
||||
|
||||
## 5) Security, Access Control, and Compliance Baseline
|
||||
## 5) Private-Network Safety Baseline
|
||||
|
||||
**Goal:** Close MVP security gaps and establish V1 baseline controls.
|
||||
**Goal:** Apply right-sized security controls for a single-user system on a trusted private network.
|
||||
|
||||
### Implementation Steps
|
||||
1. Complete authn/authz coverage for all routes/actions.
|
||||
2. Enforce input validation and output sanitization.
|
||||
3. Verify secret management and credential rotation process.
|
||||
4. Add audit logging for sensitive operations.
|
||||
5. Run dependency/security scanning in CI and remediate findings.
|
||||
1. Enforce private-network deployment assumptions in docs and configuration.
|
||||
2. Ensure basic single-operator access control for UI/API actions.
|
||||
3. Enforce input validation and safe error output behavior.
|
||||
4. Keep secrets out of source control; document local secret handling.
|
||||
5. Run lightweight dependency/security scanning and resolve high-risk findings.
|
||||
|
||||
### Deliverables
|
||||
- Security checklist with status
|
||||
- Threat/risk update for V1 scope
|
||||
- Security assumptions checklist (private network, single operator)
|
||||
- Basic risk update for V1 scope
|
||||
|
||||
### Exit Criteria
|
||||
- No unresolved critical/high vulnerabilities for V1 launch.
|
||||
- Access control behavior verified by tests.
|
||||
- No unresolved critical vulnerabilities.
|
||||
- Access behavior and validation rules are verified for intended operating model.
|
||||
|
||||
---
|
||||
|
||||
## 6) Observability & Operability
|
||||
## 6) Minimal Observability & Operability
|
||||
|
||||
**Goal:** Make system behavior observable and supportable in production.
|
||||
**Goal:** Keep operation and troubleshooting simple, clear, and reliable.
|
||||
|
||||
### Implementation Steps
|
||||
1. Standardize structured logging and correlation IDs.
|
||||
2. Add core metrics:
|
||||
- Latency
|
||||
- Throughput
|
||||
- Error rates
|
||||
- Resource saturation
|
||||
3. Add tracing for critical request/workflow paths.
|
||||
4. Define SLOs/SLIs and alert thresholds.
|
||||
5. Prepare incident response and rollback runbooks.
|
||||
1. Standardize structured logging across UI/API/service/worker boundaries.
|
||||
2. Ensure logged errors include category and error reference IDs per `error_handling.md`.
|
||||
3. Add lightweight health/startup checks.
|
||||
4. Document a concise operator runbook:
|
||||
- start/stop
|
||||
- log locations
|
||||
- common failure patterns and recovery steps
|
||||
5. Add minimal counters/timings only where they clearly improve diagnosis.
|
||||
|
||||
### Deliverables
|
||||
- Dashboards and alerts
|
||||
- Operations runbooks
|
||||
- Logging and error-traceability baseline
|
||||
- Operator runbook
|
||||
|
||||
### Exit Criteria
|
||||
- Team can detect, triage, and remediate incidents quickly.
|
||||
- Core production signals are available and reliable.
|
||||
- Operator can diagnose common failures using logs + runbook.
|
||||
- System recovery procedures are documented and repeatable.
|
||||
|
||||
---
|
||||
|
||||
## 7) Test Strategy Expansion & Quality Gates
|
||||
## 7) Test Coverage and Practical Quality Gates
|
||||
|
||||
**Goal:** Raise confidence for repeatable, low-risk releases.
|
||||
**Goal:** Prevent regressions in critical flows without overbuilding test infrastructure.
|
||||
|
||||
### Implementation Steps
|
||||
1. Expand unit and integration tests across V1 features.
|
||||
2. Add contract tests between key components/services.
|
||||
3. Add end-to-end tests for critical user journeys.
|
||||
4. Add non-functional tests where relevant:
|
||||
- Performance/load
|
||||
- Soak
|
||||
- Failure-injection scenarios
|
||||
5. Enforce CI quality gates (tests, lint, type checks, security scans).
|
||||
1. Expand unit and integration tests for all V1 requirement slices.
|
||||
2. Add end-to-end tests for critical journeys:
|
||||
- upload
|
||||
- process/transcribe
|
||||
- view result
|
||||
- failure visibility
|
||||
3. Add targeted contract tests where adapter boundaries are error-prone.
|
||||
4. Keep CI gates focused on high-value checks (tests, lint, type checks, dependency scan).
|
||||
|
||||
### Deliverables
|
||||
- Test matrix with ownership
|
||||
- CI gate definition and thresholds
|
||||
- V1 test matrix mapped to requirements and critical flows
|
||||
- CI quality-gate checklist
|
||||
|
||||
### Exit Criteria
|
||||
- Critical-path regressions are blocked automatically.
|
||||
- Test coverage and reliability thresholds meet V1 targets.
|
||||
- Critical-path regressions are automatically detected.
|
||||
- Test suite gives consistent release confidence for personal-scale operation.
|
||||
|
||||
---
|
||||
|
||||
## 8) Performance & Scalability Validation
|
||||
## 8) Performance Validation for Personal Scale
|
||||
|
||||
**Goal:** Meet expected V1 performance at projected load.
|
||||
**Goal:** Confirm acceptable responsiveness for expected personal-use workload.
|
||||
|
||||
### Implementation Steps
|
||||
1. Define performance budgets per key flow.
|
||||
2. Benchmark current behavior in staging.
|
||||
3. Optimize bottlenecks (queries, caching, concurrency, etc.).
|
||||
4. Re-test after each optimization and compare against budget.
|
||||
5. Document known limits and safe operating bounds.
|
||||
1. Define practical performance expectations for key flows.
|
||||
2. Run representative tests using real document samples.
|
||||
3. Address obvious bottlenecks in queries, file handling, or worker concurrency.
|
||||
4. Document known limits and expected operating bounds.
|
||||
|
||||
### Deliverables
|
||||
- Performance benchmark report
|
||||
- Optimization log
|
||||
- Short performance validation note
|
||||
- Known-limits summary
|
||||
|
||||
### Exit Criteria
|
||||
- V1 performance targets met for expected usage profile.
|
||||
- Core flows remain responsive for expected corpus size and usage patterns.
|
||||
|
||||
---
|
||||
|
||||
## 9) Release Engineering & Environment Readiness
|
||||
## 9) Release Readiness and Environment Simplicity
|
||||
|
||||
**Goal:** Make deployment repeatable, controlled, and reversible.
|
||||
**Goal:** Make deployment and rollback repeatable for a single-operator Docker Compose setup.
|
||||
|
||||
### Implementation Steps
|
||||
1. Harden CI/CD pipeline with clear promotion gates.
|
||||
2. Ensure config parity and consistency across environments.
|
||||
3. Define rollout strategy (phased/canary/limited release as applicable).
|
||||
4. Validate rollback procedures in staging.
|
||||
5. Produce release checklist and ownership model.
|
||||
1. Define a simple release checklist:
|
||||
- run tests
|
||||
- run one end-to-end transcription check
|
||||
- verify migration compatibility
|
||||
2. Document environment configuration requirements clearly.
|
||||
3. Validate deployment and rollback steps in a local rehearsal.
|
||||
4. Add backup/restore verification for core persisted data.
|
||||
|
||||
### Deliverables
|
||||
- Release playbook
|
||||
- Environment readiness checklist
|
||||
- Release checklist
|
||||
- Environment and rollback guide
|
||||
|
||||
### Exit Criteria
|
||||
- Deployment and rollback are rehearsed and reliable.
|
||||
- Release process is executable without tribal knowledge.
|
||||
- Deployment/rollback is rehearsed and documented.
|
||||
- Operator can release safely without hidden steps.
|
||||
|
||||
---
|
||||
|
||||
@@ -252,7 +252,7 @@ For each requirement slice:
|
||||
- Index/navigation
|
||||
- Intent alignment summary
|
||||
2. Add operator troubleshooting guides.
|
||||
3. Add integration/API examples for consumers.
|
||||
3. Add integration/API examples for the operator and future maintainers.
|
||||
4. Publish changelog/version notes for V1.
|
||||
|
||||
### Deliverables
|
||||
@@ -260,55 +260,55 @@ For each requirement slice:
|
||||
- V1 release notes
|
||||
|
||||
### Exit Criteria
|
||||
- A new team member can run/support the system using docs alone.
|
||||
- A future maintainer can run and support the system using docs alone.
|
||||
|
||||
---
|
||||
|
||||
## 11) Final Validation, UAT, and Launch
|
||||
## 11) Final Validation and Launch
|
||||
|
||||
**Goal:** Confirm readiness and launch V1 safely.
|
||||
**Goal:** Confirm V1 readiness and launch with low operational risk.
|
||||
|
||||
### Implementation Steps
|
||||
1. Run full-system acceptance validation against the V1 traceability matrix.
|
||||
2. Conduct stakeholder UAT and capture sign-off.
|
||||
3. Execute production readiness review.
|
||||
4. Launch in controlled phases and monitor key signals.
|
||||
1. Run end-to-end acceptance validation against the V1 traceability matrix.
|
||||
2. Complete operator acceptance checks on representative real documents.
|
||||
3. Execute launch checklist (including backup, migration, and rollback readiness).
|
||||
4. Launch and monitor logs/status closely during initial use.
|
||||
|
||||
### Deliverables
|
||||
- UAT/PRR sign-off records
|
||||
- Launch checklist and monitoring plan
|
||||
- Acceptance validation record
|
||||
- Launch checklist completion record
|
||||
|
||||
### Exit Criteria
|
||||
- Stakeholder approval achieved.
|
||||
- Launch metrics are stable within defined thresholds.
|
||||
- V1 requirements are validated.
|
||||
- Initial launch behavior is stable and recoverable.
|
||||
|
||||
---
|
||||
|
||||
## 12) Post-Launch Stabilization (30–60 Days)
|
||||
## 12) Post-Launch Stabilization
|
||||
|
||||
**Goal:** Consolidate V1 in production before major expansion.
|
||||
**Goal:** Address early issues quickly and lock in a reliable V1 baseline.
|
||||
|
||||
### Implementation Steps
|
||||
1. Track incidents, defects, and user feedback.
|
||||
2. Prioritize stabilization fixes with short cycle times.
|
||||
3. Remove temporary flags/mitigations introduced during launch.
|
||||
4. Produce post-launch retrospective and handoff to standard roadmap cadence.
|
||||
1. Track defects and operational pain points observed after launch.
|
||||
2. Prioritize short-cycle stabilization fixes.
|
||||
3. Remove temporary launch-only workarounds when safe.
|
||||
4. Capture a brief retrospective and update the next-phase backlog.
|
||||
|
||||
### Deliverables
|
||||
- Stabilization report
|
||||
- Prioritized backlog update
|
||||
- Stabilization summary
|
||||
- Updated backlog for post-V1 enhancements
|
||||
|
||||
### Exit Criteria
|
||||
- Incident/error rates converge to steady-state targets.
|
||||
- V1 transitions from launch mode to normal operations.
|
||||
- Major launch issues are resolved.
|
||||
- System transitions to steady personal-use operation.
|
||||
|
||||
---
|
||||
|
||||
## Recommended Execution Rhythm
|
||||
|
||||
- **Weekly:** Requirement closure + risk review
|
||||
- **Biweekly:** Release train with quality gates
|
||||
- **Milestone reviews:** After phases 2, 6, 9, and 11
|
||||
- **As needed (small batch releases):** Run release checklist and deploy
|
||||
- **Milestone check-ins:** After phases 2, 6, 9, and 11
|
||||
|
||||
---
|
||||
|
||||
|
||||
Reference in New Issue
Block a user